New Hospital of Padua, funding plan presented
November 5, 2026
On 3 November, the president of the Veneto Region, Alberto Stefani, presented the funding plan for the construction of the new large teaching hospital to be built in Padua East, for a planned investment of 880,000,000 euros.
Those attending the presentation included Sergio Giordani, mayor of Padua; Daniele Canella, president of the Province of Padua; Daniela Mapelli, Rector of the University of Padua; Gino Gerosa, Regional Councillor for Health; Giancarlo Ruscitti, director of the Region’s Health and Social Affairs Area; and Rosario Rizzuto, president of the Fondazione Cariparo.
The funding plan provides for 886,735,296.01 euros, structured across several sources: 158,066,572.96 euros in earmarked funds; 120,289,401.68 euros deriving from previous regional allocations of state funding; 180,379,321.37 euros assigned to the Region by the Ministry of Economy and Finance; 380 million euros through flexible financing; and 48 million euros from contributions for energy efficiency envisaged in the state budget package. To these resources, contributions from the University of Padua and Fondazione Cariparo will be added, intended mainly for the construction of the Research Tower.
It has been confirmed that the future teaching hospital will have a total of 963 beds and will cover an area of 220,000 square metres. The complex will be organised into four buildings: the Day Center, developed over six floors, with 275 outpatient clinics and 120 beds; the Inpatient Tower, with ten floors and 822 beds; the High-Intensity Care Platform, with seven floors, 90 beds and 32 diagnostic devices; and the Research Tower, with eight floors, six of which will be devoted to laboratories, with a biobank. A multi-storey car park will also be built.
“The new Veneto hospital in Padua represents a strategic project to address the challenges that demographic change poses to a universal healthcare system, in a society characterised by increasing longevity and by a continuing decline in births,” Gerosa emphasises. “Thanks to new technologies, it will be a centre capable of responding to citizens’ health needs, not only in the management of acute conditions, but also in the increasingly complex challenge of chronic illness. The new hospital, which, as promised, we will finally build, will be a point of reference for the needs of the local area, with a strong international outlook, capable of integrating care, research and the training of the health professionals of the future in the best possible way, always in the service of citizens.”





